![]() These redlined drawings then are used to prepare as-built drawings at the completion of each major system within the construction and installation of equipment phases.When as-built drawings are approved by the consultant, the entire set is then sent to the Systems Contractor to use during the systemization and operations phases of the contract.The Contractor will physically update the redlined drawings to incorporate revisions and on a monthly basis submit them and the drawing card or database listing for review by the consultant.The Contractor will maintain, throughout the systemization phase, a separate set of redlined, full-size, marked-up drawing set that fully indicates the current status of facilities under construction.An RFI number, ECP number, Change Order number, letter number, and report number, etc., must be cited. The Contractor will maintain a drawing card file or computer database to log changes (revisions) to the contract drawings.From this set, the general Contractor shall detach and furnish, at no charge to the Mechanical and Electrical Subcontractors the drawings of their portion of the Work for the same purpose.The general Contractor shall reserve A copy of complete set of the approved final contract drawings is to be utilized as the base sheets for the as-built & record drawings.PROCEDURES & RESPONSIBILITIES FOR “AS-BUILT” DRAWINGSġ- PROCEDURES & RESPONSABILITIES DURING CONSTRUCTION ![]() ![]() The contract requires the Systems Contractor to prepare, maintain and deliver to the consultant a set of redlined, AS-built drawings, which show the actual as-built conditions of the construction phases. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |